The evolution of the Groupe Boisson from 1920 to today

The history of Groupe Boisson

Discover the history of the Groupe Boisson in Belleville-en-Beaujolais, from its founding in 1920 to the present day. This retrospective will immerse you in the key events that shaped the company.
The evolution of the Groupe Boisson from 1920 to today
1920

Foundation of the Foundry by Pierre Boisson to serve the wine industry market.
1920
1920
1926

Titre obligatoire

Construction of a new building in Belleville-en-Beaujolais to meet the growing demand for faucets.
1926
1926
1954

Titre obligatoire

Transfer of the company to Georges and Jean Boisson. Expansion of the business with shell molding technology to serve the sanitary faucet market.
1954
1962

Titre obligatoire

Creation of SOBEFO, an aluminum foundry for the automotive industry.
1962
1988

Titre obligatoire

Transfer of leadership to Jean-Pierre and Annick Boisson.
1988
1989

Titre obligatoire

Creation of CNB Machining, a subsidiary of the Boisson Group in Belleville-en-Beaujolais.
1989
1995

Titre obligatoire

Boisson Foundry obtained ISO 9001 certification.
1995
1995
1998

Titre obligatoire

First DISAMATIC molding line for copper alloy casting.
1998
2000

Titre obligatoire

Diversification into machining of cast iron, steel, aluminum, and stainless steel.
2000
2004

Titre obligatoire

Move to a new building on Rue du Bois Baron.
2004
2004
2005

1er centre fraisage Multibroche

First multi-spindle milling center.
2005
2008

Création d’un service Robotique et vision industrielle

Creation of a Robotics and Industrial Vision service.
2008
2011

Transmission de la direction à Stéphane et Philippe Boisson

Leadership passed to Stéphane and Philippe Boisson.
2011
2014

Cellule d’ébarbage robotisée

Installation of a robotic deburring cell.
2014
2015

Nouvelle machine à mouler Disamatic MK4

New DISAMATIC MK4 molding machine.
2015
2017

Mise en place d’un chantier de moulage main pour petite série

Implementation of a hand molding line for small series.
2017
2019

Nouveau four de fusion induction VIP 750Kw dernière génération

New VIP 750Kw induction melting furnace, the latest generation.
2019
2020

Remplacement du garnissage en pisé par un creuset en béton préfritté

Replacement of the rammed earth lining with a prefired concrete crucible.
2020
2020

Obtention de la certification ISO 9001 par CNB Usinage

Obtaining ISO 9001 certification by CNB Usinage
2020
2024

Développement des alliages sans plomb

Development of lead-free alloys.
2024
2024

Nouveau système d’aspiration au secteur finition

New extraction system in the finishing sector.
2024
2024

Nouveau malaxeur avec refroidissement par air

New mixer with air cooling.
2024
2024

Cellule d’usinage multi robotisée avec dévracage 3D

Multi-robot machining cell with 3D de-burring.
2024